The Misunderstanding of Sauna Board Ceiling in Construction Process of Sauna Board Ceiling

In fact, the sauna plate is not only suitable for bathroom ceilings, home living room, study room, bedroom can be used to decorate the ceiling of the sauna panel, if the furniture in more colors, and home space is wider, in order to reduce the visual appearance of the empty, deep red sauna The board ceiling is the best choice to make the whole home full of woody flavor, but also brings a comfortable and warm feeling. The following Xiaobian introduced the construction of sauna plate ceilings and the errors in the ceiling of sauna panels.

Sauna board ceiling construction technology

1, purchase the sauna board

The first step in installing a wooden sauna board is to measure ceilings and sample planks from your local home improvement store to determine how much sauna board you need. You should add an extra 15% of measurement errors and redundant explanations.

2, ensure the level

In the construction process of the ceiling of the sauna plate, it is a foundation to ensure the ceiling construction level. Before the formal construction, the horizontal ruler should be used to measure the level of the wall enamelling line. In the construction of the ceiling of the sauna plate, only the level of the ceiling line can be guaranteed. The ceiling will not be used. Tilting or falling heights occur. The first step in the construction process of the ceiling of the sauna plate is to determine the baseline. In order to ensure the elasticity level, it is often necessary to use a level ruler or a laser level meter to measure. The sauna continues to be implemented. Using the stud finder, found nailed to the ceiling. Use a pencil to mark the ends, then make the chalk line from one end to the other. Your ceiling is vertically mounted on the ceiling keel.

4, before installation

Clear all the furniture from the room and any or trim molding, this will be the way of the item, be sure to remove it carefully, if you plan to put it back when you are finished with the item. Remove any lighting covers such as Earth, rail fixtures, ceiling fans, etc. Clear any vent covers that may be on the ceiling. You can practice putting together a sauna board on the floor to make sure everything is correct or not practiced and you can start installing.

5, installation

You need pre-drilling and attachments for your sauna board to tidy up your nails. Start your project in a corner of the ceiling and your way out in the room. The first piece must be nailed to the wall with the tongue facing outward. The following works will be nailed to the tongue at the angle of the ceiling joists. Continue to install on the sauna board until it covers the entire ceiling.

6, Sauna board ceiling finish

Once your sauna board is all in place, find the gap between the panels of the sauna. With caulking, the color of the wood you use matches the seams of any nail holes or crevices between the boards. Wipe excess caulk.

Misunderstanding in the ceiling of sauna plate

1, the pursuit of low prices

In the process of purchasing the sauna board, we must not pursue low prices too much. The so-called "one price for each item of goods", the sauna board with too low price is likely to fail to meet the quality standard, and some manufacturers take the advantage of not degreasing in order to save costs, because the cost Very high, but through graded materials, remove grease. Peltier Langxiu high-end sauna board is easy to install. After a high-temperature degreasing treatment, it can withstand high temperatures, is not easily deformed, and has a long service life.

2, no maintenance port installed

The ceiling of the sauna plate can make the home space more beautiful, and many consumers are ignoring the future maintenance while pursuing the beauty. When the ceiling of the sauna board is installed, the maintenance opening is not left on the ceiling, and the maintenance of the ceiling and wire inspection will become difficult later.

Although the setting of inspection holes may be aesthetically pleasing, the inspection openings cannot be lacking, because the ceilings may be covered with wires. Afterwards, if they are to be repaired, they cannot find any places that can be probed into. All the places are closed, and they have to be closed. To lift the ceiling completely is really worth the candle. Small ceilings generally retain a 500x600mm service port. We must not lose a little because of small losses. In fact, we can deal with traces of minor damage to the access port. The impact on aesthetics can also be minimized.

3, Sauna board ceiling details not installed

Many consumers believe that the ceiling of a sauna panel is only a small part of the decoration. It has a small area and does not need to spend too much effort on it. It is not enough for details. In the end, due to the insufficiency of the installation, the ceiling was not firm, and it was often the root cause of home safety.

The ceiling of the sauna board is the "sky" of the room. If the installation is not secure, there is a danger of collapse at any time, which seriously threatens the personal safety of the family. Therefore, when installing, be sure to install the ceiling keel, plate and other solid, do not leave any security risks.

4, blind installation of the ceiling of the sauna plate

Many consumers think that the home decoration must be adequate for the sauna ceiling. In fact, because the current commercial housing is not as good as before, it is usually only about 2.6 meters. If such a relatively small space is installed on the ceiling of a sauna panel, it will make people feel nervous and depressed visually, and then cause some physical reactions such as dizziness, nausea and so on.

The best is the best. Not all spaces are suitable for installing ceilings, and the ceiling height of the sauna board needs to be calculated. If the height of the house is only 2.6-2.8 meters, it is best to choose a simple ceiling around the smallpox. It should not be too large. Generally, the height of the ceiling is about 2.3-2.6 meters.

A good sauna ceiling should be practical in addition to its beautiful appearance. PeiDenglangxiu high-end sauna panels are not only of good quality, but also can give you scientific installation instructions after the sale. After the previous explanation, you are installing When the ceiling of the sauna board is not trapped in the above four misunderstandings?

Editor's summary: There are some misunderstandings about the construction technology of sauna ceilings and the ceilings of sauna panels. I hope to be helpful to everyone. If you want to know more about yourself, you can follow the information on this site.

Sauna board ceiling

We can produce lots of Alloy Steel Pipe that used on the Petrochemical and Refinery project, such as the P11 Steel Pipe ,P12 steel pipe ,P22 steel pipe ,P91 steel pipe,P92 steel pipe ,P5 steel pipe, P9 steel pipe and P36 steel pipe.From 2013 to 2015 year, we awarded the world`s largest P91 order from Reliance (single PO 8,000 tons P91), the final additional quantity together is up to 16,000 tons, Plus CS 11000 tons. Entire projects P grades are from Yangzhou Chengde. Our main reference list on the  Petrochemical and Refinery projects as following:

EPC Owner Project name Location Project introduction Material Size range(mm)  Qty(MT) 
Flour/Technip Sasol Lake Charles Chemical complex Lousiana USA Sasol's Lake Charles Chemical Complex is a world-scale petrochemical complex The $8.9 billion project will roughly triple the company's chemical production capacity in the U.S. and enable it to build on its strong positions in robust and growing chemicals markets. GR6/P22/P91 114~609*14.27~46.99             600
Flour/Bechtel Reliance Jamnagar Refining And Petrochemical Complex  Gujarat India The Jamnagar complex comprises of a petroleum refinery and associated petrochemical plants. The refinery is equipped to refine various types of crude oil (sour crude, sweet crude or a mixture of both) and manufactures various grades of fuel from motor gasoline to Aviation Turbine Fuel (ATF). The petrochemicals plants produces plastics and fibre intermediates.  A106B/P11/P5/P9/P91 21.3~1066.8*4.78~60.33         25,370
YC had established the post-doctoral research station since 2006 focusing on new material development such as P92, P91, X80. More than 29 kinds of new materials and products have won the national and provincial prizes from 2006 till now.

Refinery Steel Pipe

Refinery Pipe

Oil Pipe,Refinery Pipe,Astm A519 Pipe,Fuel Refinery Pipe

YANGZHOU CHENGDE STEEL PIPE CO.,LTD , https://www.chengdepipe.com