Four Steps to Improve the Construction of Mixing Stations

First: The mixing host system and feeding batching system of the mixing station should be configured according to the project duration, total amount of hydrazine, daily consumption amount, and other indicators, so as to meet the daily maximum production volume; an agitator and related ingredients The system is a production line; a general project can have a production line; large and important works should be set up with two production lines, arranged side by side, symmetrical, so as to ensure continuous supply of concrete for the project; a project can have only one mixing station or press District set up mixing station, or set up a large-scale mixing station with a suitable amount of concrete transport tanker; the specific amount can be determined according to the actual situation.
Secondly, the area of ​​sand and stone yards must be large enough to meet the needs of project consumption, and can be easily supplemented by feeding materials; sand and gravel partitions can be stacked to prevent misalignment of concrete due to mixture; Sand and gravel are stacked neatly; the site must be hardened to facilitate loader loading and prevent dirt and other debris from entering the gravel.
Third: A mixing station with 1-2 pools must be able to ensure the concrete mixing and mechanical cleaning required. A production line is equipped with at least two corresponding cement silos, preferably three, which are used in turn or added in a timely manner to meet the needs of concrete production and do not make the cement backlog. The bulky and pumped concrete generally need to be mixed with fly ash and additives, and they should be placed according to the site conditions, so as to facilitate the use.
Fourth: As for the method of transporting finished concrete, concrete pumping methods or tanker trucks can be used. The concrete pump method is based on the delivery distance and height and the supply of helium. It is generally arranged in front of the mixer and connected to the pouring place with a pump pipe. The place where the concrete pump cannot reach or where it is far away can be used. Tanker mode is more appropriate.
The basic method for establishing a station is based on these points. The remaining concrete mixing plant components can be assembled according to production needs.

cotton dyeing

Vat Dyes,Color Dye,Cotton Dyes

Tianjin Zhaobo Chemical Co., Ltd. , http://www.tjaciddyes.com