Several points of the wall painting process

Links: This site friend wall paint construction record

First, when painting the walls, the premise is to dry the walls, remove dust and dirt on the walls, and then paint the outer walls. If you want to clean the walls, paint them within 24 hours. It takes more than 6 hours for the walls to come.

Second, if there are crevices or bumps on the wall, it can be filled with putty, sandpapered with sandpaper, and finally the surface dust.

Third, after the putty dries, the next step is to use a primer. Generally, the primer is applied twice. The intermediate interval is about 7 hours. The final effect is that the primer is not painted after painting and the wall is completely covered. .

Fourth, the final environmental protection paint stucco wall, the premise is to ensure that the wall surface is flat, dry, no dust, generally painted twice, the interval time is about 3 hours.

Brand Shop: Nippon Paint Dulux Ou Long Paint Master Paint Fenlin Paint

Wall construction paint

Glass Pot Cover tempering furnace

SHENZHEN HUACAI GLASS MACHINERY CO.,LTD , http://www.hcglassmachinery.com