Secret decoration construction ten common stealing tricks

Many young people's decoration for the first time, do not understand anything, it is easy to be deceived by bad decoration companies, cut corners and lead to poor house decoration quality. It is advisable to find an experienced friend to occasionally inspect, to find out where the construction is tricky and to safeguard their own legitimate rights and interests.

Brand Shop: Long Sunny Decoration Manchester City Decoration

1 Substrate Handling Stealing Index: ★★★★★

Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.

Experts advise: In the construction of paving tiles, you should pay attention to the tiles can not be directly laid on the surface of lime mortar, lime cream, lime paper plaster, hemp stone mortar and latex paint, but to clean the base level Lapping treatment can be done. Bonding pastes used between tiles and substrates should be formulated in strict accordance with the construction standards and proportions, using the specified grades of cement and adhesive materials, and they cannot be randomly deployed. When applying latex paint, you must pay attention to whether the shading of the wall putty is even and smooth, whether the sanding and rolling are in place. In addition, you should pay attention to the suitability of the latex paint.

2 Ground Leveling Stealing Index: ★★★★★

Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevenness”, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building. Regular operation without protection will return to sand is very serious, and some only cast a layer of cement over the surface of the sand Mongolian owners.

Experts advise: Before ground leveling, ground surface treatment must be done first, and then use cement mortar to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler. Then proceed to the next step of construction.

3 Facet Handling Stealing Index: ★★★★☆

Phenomenon: The so-called "small face" is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. Some workers will be here. If you cut corners, you will not even do anything.

Experts advise: Remember that there are 6 planes for any object. Don't ignore any details when checking the quality of the project.

4 wire pipe stealing work index: ★ ★ ★ ★ ☆

Phenomenon: In the home improvement construction, almost all wires are put in PVC pipes and buried in the walls. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe.

Experts advise that consumers should check the purchased wires and then supervise workers' operations at the site. After the installation is complete, check the power supply. In addition, consumers must allow the construction party to leave a "pipeline map." When the electrician had just buried the wires in the wall, he could number the walls and draw a floor plan. Then he used the strokes to draw the direction of the wires and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.

5 seam modification shark index: ★ ★ ★ ★

Phenomenon: In some places where the wall meets the door and the window, and where the two different colors of paint are docked, it is also where the workers often perfunctory. You will often see mixed paints between latex paint and wood, with various problems at the joints. What's more, the wood is painted with a wall paint.

Experts advise: The treatment of joints is very important, you must supervise the workers to seriously construct. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.

6 Wall nicking and stealing index: ★★★☆

Phenomenon: The buried pipeline must be slotted on the wall and the ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.

Experts advise: Before construction, we must reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.

7 Wall Tile Paving Steal Index: ★★★

Phenomenon: Paving tiles is a technical process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding. In addition, the entire wall is prone to spelling, and it is to be designed ahead of time.

Experts reminded: According to the Beijing Construction Committee issued the "family home decoration project quality acceptance standards," require tile paving should be flat and solid, clear patterns, no dirt and paste marks, the surface color is basically the same, uniform seams, plate crack-free , drop angles and missing edges, local emptying may not exceed 5% of the total.

8 wire connector stealing index: ★ ★ ☆

Phenomenon: When the electrician installs sockets, switches, and lamps, it does not wire according to the construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers.

Experts advise: In the construction of supervision of electricians in strict accordance with the operating procedures for construction, after all the switches, sockets installed, be sure to carry out the actual use to see if these parts have a fever phenomenon. 9 Sewer Stealing Index:★★

Phenomenon: During the renovation of the construction team, in order to save time, a large amount of concrete, sand, and concrete fragments are poured into the sewer. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water.

Experts advise: Strict supervision of the construction team, can not use the sewer as rubbish use. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then the water is discharged at the same time to see if the water is unobstructed and if there is any leakage of the pipeline.

10 Wall paint painting jail index: ★☆

Phenomenon: Latex paint is the most common wall decoration material. It can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur. Dujiangshui province paint poor.

Experts advise: Before the use of latex paint to add a certain amount of water, deployment of a good latex paint to run out. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again. (It is best for the owner himself to buy a wall paint)

The construction tricks that are common in the above 10 basically cover all aspects of hard-mounted construction, many of which are hidden projects. The study found that most of the concealed construction companies cut corners and cut corners, so once again remind friends who want to be renovated, with wide eyes. Otherwise there will be endless trouble in the future.

Links: How to clean up and maintain artificial stone products

Renovation of catchy three trees Paint entrance decoration paint Lacquer paint Cement decoration Decorating decoration company Okay Bathroom design Bathroom tile color Bathroom tile Bathroom floor tile Bathroom door Tile adhesive Kitchen tile ld Tile

LM PLC

LM PLC, Yumo Lm3320 Programmable Logic Controller PLC for Intelligent Control, China LM PLC

WENZHOU BOSHI SAFETY PRODUCTS CO.,LTD , http://www.osha-lock.com