Outdoor decoration design, floor tile paving method and precautions

Nowadays, outdoor activities have gradually become the target of our concern. They are always indoors, and they must be moldy. But the family has a coveted white pheasant and a child who just learned to walk. It is an insignificant thing to fall. Therefore, it is very important to lay out the regular floor tiles in the outdoor. What is the use of the outdoor decorative floor tiles? What are the precautions for the exterior decoration of the house? Next, follow the decoration of the home network. Learn about the relevant content!


室外装饰


First, outdoor decoration design floor tiles precautions


1, square bricks. Suitable for square tiles on the ground, roof tiles for roofs, and supermarket bricks for indoor use. Usually square tiles are also equipped with blind bricks and stop bricks, usually yellow, gray and black. Because of its super wear-resistant, anti-slip and beautiful decoration, it is widely used in leisure squares, municipal engineering, supermarket stores, 4S shops, garden beautification, beautiful roofs, garden balconies and public places with a lot of traffic, with non-slip, wear-resistant, The characteristics of beauty and repairing the convenience are the decoration materials of the top and the roof of the modern city.


2, lawn bricks. Turf bricks can be prefabricated into various specifications and colors according to demand. They are set with various markings, assembled into different drawings, beautifulr than concrete, and can reduce the glare of the ground reflection, reduce the reflection of radiation on the ground, and cut the ground. The transfer of hot gases. Lawn bricks are widely used in urban road reconstruction, park construction, and community beautification.


室外装饰


Second, outdoor decoration paving bricks


1. When the bottom layer is processed, all kinds of dirt on the ground should be collected and watered and moistened one day earlier. If the bottom layer is on the new ground, when the cement mortar is 70% dry, it should be arranged for brick, bullet and tile.


2. It is necessary to post the specification point before the official posting to control the flatness of the posted appearance. When operating, always use the ruler to check the flatness. If it is not flat or straight, remove the sticky.


3, before the tile is posted, it is necessary to soak in the water for more than two hours, the brick body is not bubbled, take out and dry for use. When posting, from the bottom to the top, ask for the fullness of the mortar, when it is ash, it is necessary to remove the heavy sticking, and do not agree to fill the mat from the brick joints and the mouth.


4. When encountering the pipeline, the switch of the lamp, the support of the equipment of the cleaning room, etc., it is necessary to cut the fit with the whole brick set, and stop the use of the whole brick to collect the post. The whole or separate parts should be posted once, and once the end is not completed, the mouth should be left at the construction joint or the corner of the corner.


The above is a detailed answer to the Xiaobian, I don't know if you are satisfied with the introduction of the decoration home network Xiaobian~ If you want to know more about the exciting content, please continue to pay attention to our decoration encyclopedia!


More related wonderful reading:

How to buy outdoor decorative lines, how to install decorative strips

What are the outdoor decorative materials? Interior decoration precautions

Outdoor decorative line type outdoor decorative line purchase tips


Kn95 Mask

Kn95 Mask,Kn95 Respirator Mask,Kn95 Nonwoven Mask,Nonwoven Earloop Kn95 Mask

Chongqing Yilun Sanzi new packaging Co., Ltd , https://www.yilunmask.com