Graphic explanations: Acceptance of hydropower can not be ignored 17 details

When it comes to the acceptance of hydropower projects during the renovation, most of the owners are often unable to start and do not know how to check whether the workers' construction complies with the regulations. If you have encountered such a situation, you may wish to follow Xiao Bian together to see what details the supervisors are paying attention to when they examine the hydropower project.


Ruihe water pipe

1, follow the "horizontal and vertical" principle

The first step in hydropower reform is to see if the laying of pipes and wires is reasonable. If water pipes and wires are not embedded in accordance with the specifications, it is difficult to confirm the location of pre-embedded water pipes when the hydropower reform is completed. In the later stage of construction, nails need to be nailed on the wall surface, and it is possible to accidentally break through the water pipes or wires, causing bursts of water pipes, leakage of electric wires, etc.; and if it is necessary to overhaul, it is difficult to find the location of the water pipe wires. trouble.

Key details: The principle of "horizontal and vertical" should be followed in the laying of hydropower. In addition, the switch sockets in the same room should also be on the same horizontal line. The switch can be 1.4 meters from the ground and the height of the socket and ground should be kept at 30 centimeters.

2. Sewer pipeline needs to be protected

Some construction workers were sloppy and had no protection for the existing sewers during the hydropower reform construction. That is, they did not close the nozzles of toilet drain pipes and sink drain pipes. This can easily lead to the construction materials falling into the sewer pipe to cause blockage.

Key details: According to the construction specifications, the protection of finished products should be completed before the construction of hydropower reforms. Closure of sewers is one of them.

Hydroelectricity Rehabilitation Plumbing Receipt Bathroom Cement Interior Decor Switch Toilet Tile Toilet Door Bathroom Tile Color Integral Toilet Bathroom Waterproof Toilet Leaking Kitchen Tile Decoration Home LD Tile

1 2345 ... 9 Next> Total 9 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

We have the following Door Escutcheon & Rosettes: Round Rosette And Escutcheon, Square Rosette And Escutcheon, Casting Rosette And Escutcheon and some threaded ones. Rosette is an cover for the base of a set of door handle, standardly made in round shape and some are made with special designs. Escutcheons are made with holes according to cylinder keys.
Some covers are very thin pieces. And some are with bases, made in stainless steel, steel or plastics etc.
Shape: Round, Square, Oval
Standard key holes: Euro-profile cylinder hole, Oval hole, Small key holes etc.
Should you have any further demands, please feel free to contact us any time. And welcome for OEM products with detailed technical drawings.

Door Escutcheon & Rosette

Door Escutcheon & Rosette,Round Rosette And Escutcheon,Square Rosette And Escutcheon,Casting Rosette And Escutcheon

Greatwall Hardware International Limited , http://www.greatwall-hardware.com