Pay attention to the four blind spots in the decoration offer

Project quotes are an unprecedented experience for most families and often do not know how to choose. Because of the same design, quotes sometimes differ by one third. In fact, the price of a renovation project is determined based on the quality of the materials used and the complexity of the construction methods. Different materials and practices will have different prices.

If you do not have decoration experience, are not familiar with the materials and practices, and cannot grasp the authenticity and reliability of the quotation, the easiest way is to select one or two companies with scale, credibility, and site to look at and sit down. Seriously analyze and review the project, obtain a construction plan and construction program that make you completely clear, understand the structural basis of the project quotation, and finally negotiate a price that is reasonable and acceptable to both parties. Specifically, the decoration company's offer must show you the project, quantity, material, specifications, unit price, total price, etc.

The following are the areas where blind quotes often appear:

1, fuzzy design

Often in the initial budget, most companies do not simply quote a quoted price based on company or industry practice. The quoted price is still reported on the basis of the owner’s mentality, and the difference is either high or low. As a wardrobe, A company quoted 620 yuan / square meter, B company quoted 720 yuan / square meter. It is very likely that the main structure of the company's closet is a 15 PCT board, or even a light body in the cabinet. The light body is not affixed to the inner board, and B company 720 yuan/square meter is another method, not the lower the price The better.

2, hide the project

At the time of quotation, some companies will report some items that should be done during the preliminary budget quotation, thus creating lower bids and attracting the owners to come in. Those projects that have not been reported at the beginning of the project will gradually increase, and you must not do it. Those are all must do.

3, concealment quantity

The practice is to symbolically report the number of projects under construction at the time of preliminary budget quotations, and conceal a large number of them, making the companies with relatively rigorous budget quotations truthfully report much lower and calculate the statistics at the time of settlement.

4, separate quote

The management fees, etc., are not mentioned in the initial budget quotation, and will be mentioned when the contract is signed.

Learn to see the offer decoration design home decoration decoration decoration company okay

Gantry Flame Cutting Machine is the most widely used metal plate CNC Cutting Machine at the present stage. 
1. Strong cutting ability, wide cutting range, good cutting effect, fast response and high cutting efficiency. 
2. The gantry Flame Cutting Machine can simultaneously assemble up to 11 flame torches for straight strip cutting of medium-thick plates, which are heated bilaterally to prevent deformation.  
3. Railway tracks of cutting machine that can be retrofitted. The longitudinal travel of the equipment can be extended by 30 meters, and it is suitable for installation in a workshop with a large site and a long plate.

4. Gantry CNC flame cutting machine applicable to steel market cutting, shipyards, wind turbines, steel structure plants, etc. 

1509998240_IMG_2680

Gantry Flame Cutting Machine

Plasma Cnc Machine,Gantry Type Plasma Cutting Machine,Air Plasma Cutting Torch,Gantry Flame Cutting Machine

Jinan Huaxia Machinery Equipment CO.,Ltd , http://www.huaxiacnc.com